Project Summary

SKE was assisting a highway planting contractor to restart their landscape construction work on Highway I-880 and SR 92 interchange. The scope of work for this project included the followings;

  • Coordinated with the construction manager to restart the work,
  • Redefined drainage areas and sampling points,
  • Submited SWPPP amendments, CEM 2008 and CEM 2009,
  • Prepared SWPPP Winterization Plans,
  • Provided stormwater training included stormwater samplings to contractor's staffs and prepared training record, CEM 2023,
  • Performed storm event and weekly Stormwater Site Visual Inspection and prepared reports, CEM 2030,
  • Reviewed pre-storm, during storm, post storm, and quarterly non-storm discharge observation reports,
  • Reviewed Corrective Action Summary reports, CEM 2035,
  • Reviewed Best Management Practice Status reports, CEM 2034,
  • Prepared Rain Event Action Plan (REAP), CEM 2045,
  • Reviewed Weather Forecast Log, CEM 2040 and Weather Monitoring Log, CEM 2041,
  • Reviewed stormwater samplings and report, CEM 2051 and CEM 2052.

The project was started in summer of 2013 and completed in the summer of 2014.